Projects for Nelson Field

2004 Bond Program Scope of Work

• Renovate/refurbish men’s and women’s restrooms at east football grandstands
• Renovate football and baseball stadium press boxes
• Renovate ticket and concessions booths
• Replace natural turf with synthetic playing surface
• Repair, repave, reseal and restripe parking lot
• Repair/resurface track
• Replace fence panels at football and baseball fields
• Install security fence around maintenance building
• Install automatic controls on existing irrigation system at baseball fields
• Install ventilation system for dressing/locker rooms
• Replace selected door hardware at dressing/locker rooms
• Repair/replace existing electrical outlets and add new outlets at track level, in concession area and at public restrooms
• Install safety and security enhancements

Phases

Current Schedule Budget General Environmental
Roofing. Replacement of the football field press box roof and all of the roofs at the concession stand and restroom buildings. Complete. Under budget.* Grouped with two other facilities. New replacement roof system will provide increased thermal efficiency and solar reflectivity.
All repairs and renovations including turf replacement, safety and security enhancements. Substantially complete. Under budget.* Athletic Department funded additional projects out of maintenance and operation budget. Reduction of water usage associated with irrigation, depletion of pesticides and fertilizers on natural turf.
Repair and replacement of roof at field house. Complete. Under budget.* New replacement roof system will provide increased thermal efficiency and solar reflectivity.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors