Apple At Work Home En Español Interactive Map Annual Reports Complete Bond
Election Information
2004 Bond Program 2008 Bond Program
Contingency Funds Community Bond
Oversight Committee
Performing Arts
Center Task Force
Community Involvement Bond Programs Focus Environmental Safety Technology New Schools and Facilities Videos and Photos Contact Us FAQs The Apple at Work Logo For Contractors For Architects &
Engineers
 
Projects for Baker Center

2004 Bond Program Scope of Work

• Construct additional parking spaces inn selected areas
• Install additional exterior security lighting
• Improve storm/site drainage at building perimeter
• Construct dumpster pads
• Repair/replace deteriorated soffits at east and south entry porches
• Replace exterior doors, frames and hardware
• Repair/replace approximately 30,000 square feet of built-up roofing
• Replace original/deteriorated window systems at west and south sides
• Replace deteriorated ventilation system controls and connect to BEMS
• Replace ventilation system equipment in selected locations
• Increase electrical service and circuitry in selected areas
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Install accessibility compliant elevator and create accessible exterior pathway
• Replace selected heating, ventilation and air conditioning system equipment
• Install automatic power factor correction and harmonic distortion mitigation system

Phases

Current Schedule Budget General Environmental
Regrade portions of site; rework downspouts; install exterior security lighting; replace windows on west and south side of building; replace existing heating, ventilation and air conditioning and installing new controls; install 20 additional parking spaces; replace exterior doors, frames and hardware; construct dumpster pads; replace exterior soffit panels; install additional electrical branch circuit panel. Complete. Within budget.* Postponed until late fall 2009 to coordinate necessary construction sequencing. Leaks at glass window panes being repaired at expense of contractor. Installation of energy-efficient windows and heating, ventilation and air conditioning equipment.
Renovate gym spaces for media service center. Complete. Within budget.*
Replace approximately 30,000 square feet of built-up roofing. Complete. Within budget.* New replacement roof system will provide increased thermal efficiency and solar reflectivity.
Safety and security: card reader door access. Complete. Within budget.* Grouped with three other facilities.
Safety and security: closed circuit TV. Complete. Under budget.* Grouped with four other facilities.
Install automatic power factor correction and harmonic distortion mitigation system. Construction phase. Under budget.* Grouped with nine other facilities.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors