2004 Bond Program Scope of Work
At field house, improve perimeter storm/site drainage
At baseball stadium, relocate outfield area drains
Repair/resurface track
Replace natural turf with a synthetic playing surface
At football stadium, construct dumpster pad
Replace fencing and backstop at baseball field and fencing at football field
Install automatic controls for irrigation system at baseball field
At football stadium, patch and repair concrete structure, and patch, repair and reseal paving at various locations under grandstands
At baseball stadium, refurbish press box, main entry and dugouts
At field house and football stadium storage areas, replace two roll-up doors
At football stadium, repair press box roof, ceilings and walls
At field house, renovate one each mens and womens restrooms for accessibility compliance
At field house, modify one concession counter for accessibility compliance
Replace deteriorated ventilation system controls and equipment
Replace ventilation system, cooling tower and boilers
Replace emergency egress lighting
Replace wooden pole lighting system at baseball stadium
At field house, replace selected plumbing fixtures
Install safety and security enhancements
2008 Bond Program Scope of Work
Install automatic power factor correction and harmonic distortion mitigation system.
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Renovations. Turf replacement at the football field and track, lighting at the baseball field, accessibility renovations at the Field House, addition to accommodate athletic offices. |
Complete. |
Over budget due to increased site work cost required by Sunset Valley.* |
Funding for athletic office expansion from sale of Rio Grande property. |
Overhangs, window tint, use of low VOC (volatile organic compound) materials, light colored finishes, environmentally friendly refrigerants, high efficiency lighting system, LED exit signs, lighting controls, water saving equipment and fixtures, building system commissioning. |
| Install new cooling tower. |
Complete. |
Over budget.* |
|
Replaced with high efficiency unit. |
| Install automatic power factor correction and harmonic distortion mitigation system. |
Construction phase.
|
Under budget.*
|
Grouped with 10 other facilities. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.