2004 Bond Program Scope of Work
Replace canopy light fixtures
Construct additional parking spaces at selected locations
Install additional exterior security lighting
Improve storm/site drainage at building perimeter
Construct concrete dumpster pads
Replace deteriorated exterior doors and hardware
Repair/replace approximately 40,000 square feet of built-up roofing
Replace deteriorated windows in main corridor and seal perimeter of selected classroom windows
Renovate two student restrooms
Refurbish/replace sink cabinets in 100- and 200-classroom wings
Replace damaged ceiling tile in selected areas
Replace damaged ceilings in student group restrooms and replace exhaust fans in classroom restrooms
Replace sanitary sewer lines serving 100- and 200-wings
Install playslab cover
Install safety and security enhancements
2008 Bond Program Scope of Work
Technology upgrades
Cafeteria and kitchen improvements
Replace dishwasher
Projects Funded Through Contingency Funds Critical Renovations:
Replace main electrical switchgear
Repair/replace sanitary sewer line
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Cafeteria renovations: modify/add hand was sink(s), replace ceiling enclose exposed ductwork and conduit. |
Complete. |
Over budget due to unanticipated additional work required by the Health Department and the Industrial Waste Department.* |
Grouped with three other schools. Project delayed due to City of Austin inspections. Additional scope required includes grease traps, view ports and revised kitchen layouts. |
|
| Install additional exterior security lighting; construct concrete flumes in courtyard between 100 and 200 wings to divert storm water; replace deteriorated exterior doors and hardware; replace approximately 40,000 square feet of built-up roofing; replace deteriorated windows in main corridor and seal perimeter of various classroom windows; replace sanitary sewer lines serving 100 and 200 wings; replace canopy light fixtures; construct parking lot with exterior security lighting; construct concrete dumpster pads; construct pair of accessible student toilets; refurbish/replace sink cabinets in 100 and 200 classroom wings; replace stained/damaged ceiling tile; replace damaged ceilings in student group restrooms; replace deteriorated/non-functioning exhaust fans in classroom restrooms. |
Complete. |
Within budget.* |
Paired with Summit Elementary School project. Roofing issues addressed. Rains delayed start of work. Administration area complete with remainder over classroom wings bid as a separate projectl. |
Austin Energy Green Building strategies will be employed. |
| Install playslab cover. |
Complete. |
Within budget.* |
Grouped with five other schools. |
|
| Safety and security: card reader door access and door repair. |
Complete. |
Within budget.* |
Grouped with two other schools. |
|
| Safety and security: closed circuit TV. |
Complete. |
Within budget.* |
Grouped with two other schools. |
|
| Replace dishwasher. |
Complete. |
Within budget.* |
Grouped with 12 other schools. |
|
| Replace main electrical switchgear. |
Complete. |
Under budget.* |
Grouped with Pleasant Hill Annex and Sunset Valley Elementary. |
|
| Repair/replace sanitary sewer line. |
Complete. |
|
Grouped with four other schools. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|