2004 Bond Program Scope of Work
Construct additional parking spaces at front entry drive
Construct new drop-off loop drive
Construct concrete dumpster and recycling bin pads
Repair/replace approximately 68,700 square feet of built-up roofing
Replace damaged door and window glazing
Extend wall partitions to ceiling to enclose library
Replace deteriorated ventilation system controls and equipment
Install emergency egress lighting
Replace electrical switchgear and motor controls
Install additional electrical outlets for library and computer lab
Replace selected library casework/cabinetry/furnishings
Construct story-telling structure in library
Install playslab cover
Install safety and security enhancements
2008 Bond Program Scope of Work
Technology upgrades
Replace heating, ventilation and air conditioning system equipment in kitchen
Replace one heating, ventilation and air conditioning system chiller
Install automatic power factor correction and harmonic distortion mitigation system
Projects Funded Through Contingency Funds Critical Renovations:
Replace heating boiler and pumps
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Replace 68,700 square feet of roofing. |
Complete. |
Under budget.* |
|
Increase thermal efficiency and solar reflectivity. |
| Replace door and window glazing, replace ventilation system, construct additional parking and loop drive, install playslab cover, install emergency egress lighting, install additional electrical outlets, replace furniture, equipment and fixtures in library, safety and security enhancements. |
Complete. |
Over budget.* |
Grouped with Becker Elementary School and Metz Elementary School projects. |
Energy efficient heating, ventilation and air conditioning equipment used. |
| Replace one heating, ventilation and air conditioning system chiller. |
Complete. |
Under budget.* |
Paired with work at Mendez Middle School. |
Heating, ventilation and air conditioning equipment will be high efficiency and meet or exceed latest energy standards (ASHRAE 90.1, 2001). |
| Install automatic power factor correction and harmonic distortion mitigation system. |
Construction phase.
|
Under budget.*
|
Grouped with 10 other facilities.
|
|
| Replace heating boiler and pumps. |
Design phase. |
|
Paired with Widen Elementary School. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.