Engineers
 
Projects for Summitt

2004 Bond Program Scope of Work

• Construct additional parking in selected spaces
• Replace canopy roof flashing at 300-wing entry
• Install additional exterior security lighting
• Repair/replace deteriorated exterior doors, frames and hardware
• Repair/replace approximately 43,000 square feet of built-up roofing and metal canopy
• Replace folding wall between gym and cafeteria
• Install masonry control joints in interior walls at gym and cafeteria
• Replace ventilation system cooling tower
• Replace deteriorated exhaust fans
• Replace ventilation system equipment in selected areas
• Install additional electrical circuits and outlets in library
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Replace heating, ventilation and air conditioning system equipment in cafeteria, gymnasium and kitchen
• Install automatic power factor correction and harmonic distortion mitigation system

Phases

Current Schedule Budget General Environmental
Install canopy flashing at corridor 310 entry; install exterior security lighting; repair/replace deteriorated exterior doors, frames and hardware; construct additional on-site parking spaces; replace deteriorated movable wall between the gym and cafeteria; install masonry control joints in interior walls at gym and cafeteria; replace deteriorated/non-functioning exhaust fans; install new air conditioning unit for counselors’ area; repair/refurbish heating, ventilation and air conditioning system heat pumps; install additional electrical circuits and outlets in the library. Complete. Within budget.* Paired with Wooten Elementary School project. Austin Energy Green Building strategies will be employed.
Repair/replace approximately 14,100 square feet in built-up roofing. Complete. Within budget.* Some of original scope of work was deferred to later date. A modified bitumen roof with a white granular surface will be installed on roof replacements to lower cooling requirements and extend the life of the roof.
Kitchen hood fire suppression replacement. Complete. Under budget.*
Safety and security enhancements: card reader door access and door repair. Complete. Within budget.* Grouped with two other schools.
Safety and security enhancements: closed circuit TV. Complete. Within budget.* Grouped with two other schools.
Provide additional electrical power for computer network upgrades. Complete. Over budget.*
Air conditioning improvements in technology room. Complete. Within budget.* All new mechanical systems will meet and exceed the latest energy standards.
Replace approximately 43,000 square feet of built-up roofing and metal canopy. Complete. Over budget.* Additional work not performed in 2006.
Replace heating and air conditioning cooling tower. Complete. Within budget.* System design in accordance with energy standards (ASHRA 90.1).
Install playslab cover. Complete. Within budget.* Grouped with four other schools.
Replace heating, ventilation and air conditioning system equipment at kitchen. Complete. Within budget.* Grouped with work at Norman Elementary School. Heating, ventilation and air conditioning equipment will be high efficiency and meet or exceed latest energy standards (ASHRAE 90.1, 2001).
Install automatic power factor correction and harmonic distortion mitigation system. Construction phase. Under budget.* Grouped with nine other facilities.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors