Projects for Palm

2004 Bond Program Scope of Work

• Construct eight-classroom addition
• Construct curb ramp at drop-off loop
• Construct additional on-site parking spaces on south side of campus
• Construct concrete dumpster pad at kitchen loading dock
• Repair/ replace portions of existing metal roof
• Replace ventilation system cooling tower
• Refurbish/ replace/ modify ventilation system equipment in selected locations
• Install mechanical ventilation system in under-floor crawl space
• Replace electrical conduit in crawl space under kitchen
• Replace sanitary sewer lines serving kitchen
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Install automatic power factor correction and harmonic distortion mitigation system

Phases

Current Schedule Budget General Environmental
Replace water source heat pumps and cooling tower. Complete. Under budget.* High efficiency equipment.
Repair/replace portions of existing metal roof. Complete. Under budget.* Grouped with two other schools. New replacement roof system will provide increased thermal efficiency and solar reflectivity. Work includes metal roof repair.
Install playslab cover. Complete. Under budget.* Grouped with two other schools.
Construct eight-classroom addition and new parking area. Complete. Within budget.* On-site detention, sedimentation/ filtration ponds, overhangs, window tint, high mass wall construction, use of low VOC (Volatile Organic Compound) materials, light colored finishes, environmentally friendly refrigerants, high efficiency lighting system, lighting controls, water saving equipment and fixtures, building system commissioning.
Kitchen hood fire suppression replacement. Complete. Within budget.*
Heating and air conditioning improvements and ventilation to classrooms. Complete. Within budget. Funded with 2002 Bond Program funds.* System design will comply with applicable energy standards (ASHRAE 90.1).
Install automatic power factor correction and harmonic distortion mitigation system. Construction phase. Under budget.* Grouped with nine other facilities.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors