|
|
|
2004 Bond Program Scope of Work
Improve storm/site drainage at building perimeter
Construct canopy between kitchen and exterior freezer/cooler
Replace deteriorated exterior door hardware
Repair/replace approximately 57,000 square feet of built-up roofing
Extend mechanical room walls to under side of roof deck
Replace selected ventilation system controls and equipment
Repair/replace deteriorated restroom exhaust fans
Install new ventilation system equipment for administration area
Install emergency egress lighting
Install additional electrical outlets in library
Construct art room and kiln room
Install playslab cover
Install safety and security enhancements
2008 Bond Program Scope of Work
Technology upgrades
Replace selected heating, ventilation and air conditioning system equipment in cafeteria, gymnasium and administration area of annex
Install automatic power factor correction and harmonic distortion mitigation system
Projects Funded Through Contingency Funds Critical Renovations:
Repair/replace heating, ventilation and air conditioning equipment
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Regrade portions of the site to improve drainage away from building. |
Complete. |
Under budget. Partially funded with 2002 Bond Program funds.* |
Project moved forward to take advantage of 2002 bond contractor already on site. Grouped with five other schools. |
|
| Kitchen hood fire suppression replacement. |
Complete. |
Under budget.* |
|
|
| Repair/replace 57,000 square feet of built-up roofing and upgrade insulation; install new ventilation system equipment, replace door hardware, install playslab cover, construct canopy, extend mechanical room walls, upgrade electrical outlets in library, construct art room and kiln room, safety and security enhancements. |
Complete. |
Over budget.* |
Additional project scope to include two air conditioning and heating units to serve the gym and cafeteria and refurbishing the four existing main building units. New fire hydrant and water main line were required. |
New roof system will provide increase thermal efficiency and solar reflectivity, sustainable components for art room, energy utilization improvements. |
| Replace heating, ventilation and air conditioning equipment at Oak Hill Elementary School gymnasium, cafeteria and music room and Oak Hill Annex administration area. |
Complete. |
Over budget.* |
|
|
| Repair/replace heating, ventilation and air conditioning equipment. |
Substantially complete. |
|
Grouped with projects at Doss Elementary School and Covington Middle School. |
|
| Install automatic power factor correction and harmonic distortion mitigation system. |
Construction phase. |
Under budget.* |
Grouped with 10 other facilities. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|
Find Out What's Happening at your School
Upcoming Events
There are no events scheduled.
Other Events
|