Engineers
 
Projects for Mathews

2004 Bond Program Scope of Work

• Install railing for front stairs
• Repair exterior masonry walls
• Repair/replace approximately 7,000 square feet of built-up roofing
• Replace deteriorated windows in selected locations
• Install elevator
• Replace ceiling, lighting, and curtains at cafeteria stage
• Replace worn floor covering in cafeteria
• Replace ventilation system equipment in cafeteria
• Replace grease trap
• Replace deteriorated sanitary sewer and domestic water lines serving kitchen
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Construct built-in storage units for selected classrooms
• Cafeteria and kitchen improvements
• Install automatic power factor correction and harmonic distortion mitigation system

Projects Funded Through Contingency Funds

Critical Renovations:
• Replace heating, ventilation and air conditioning equipment in kitchen

Phases

Current Schedule Budget General Environmental
Kitchen hood fire suppression replacement. Complete. Under budget.*
Install railing for front stairs, replace 7,000 square feet of built-up roofing, replace deteriorated windows, replace grease trap, replace sewer and water lines under kitchen, install elevator, repair exterior masonry walls, replace ceiling lighting and curtains of stage, replace floors in cafeteria, replace heating and air conditioning units in cafeteria, safety and security enhancements. Complete. Under budget.* Grouped with O. Henry Middle School project. New mechanical systems will meet or exceed latest energy standards. New roof will increase thermal efficiency and solar reflectivity.
Install playslab cover. Complete. Within budget.* Grouped with six other schools.
Construct built-in storage units in selected classrooms of original building. Complete. Over budget.* Grouped with three other schools.
Cafeteria/kitchen renovations: install ceiling above serving line, enclose ductwork, install new handwash sink, provide new outlets for refrigerator and mixer, new enclosure for dumpster and add two sanitary inspection ports. Complete. Over budget due to additional work at some schools.* Grouped with projects at five other schools.
Install automatic power factor correction and harmonic distortion mitigation system. Construction phase. Under budget.* Grouped with 10 other facilities.
Replace heating, ventilation and air conditioning equipment in kitchen. Design phase. Grouped with three other schools.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors