Projects for Hill

2004 Bond Program Scope of Work

• Construct enclosed exterior mop room at loading dock
• Install additional bike rack and construct connecting walkway
• Repair plaster at front entrance canopies
• Repair asphalt, seal and restripe parking lots
• Install additional exterior security lighting
• Repair/replace deteriorated exterior metal doors, frames and hardware
• Replace expansion joint cover at floor in library and repair/replace adjacent floor covering
• Replace selected ventilation system equipment in classrooms
• Install plaster sink in art room
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Replace dishwasher
• Install automatic power factor correction and harmonic distortion mitigation system

Phases

Current Schedule Budget General Environmental
Playslab cover. Complete. Under budget.* Grouped with five other schools.
Safety and security: closed circuit TV. Complete. Within budget.* Grouped with six other schools.
Safety and security: card reader door access and door repair. Complete. Within budget.* Grouped with six other schools.
Install additional security lighting; replace selected exterior doors; install plaster sink in art room; replace selected heating, ventilation and air conditioning units; loading dock improvements; install new bike rack with connecting canopy; repair plaster canopies; repair and reseal parking lots; install expansion joint cover in library. Complete. Under budget.* Heating, ventilation and air conditioning equipment will be high efficiency and meet or exceed latest energy standards (ASHRAE 90.1, 2001).
Replace dishwasher. Complete. Within budget.* Grouped with 12 other schools.
Install automatic power factor correction and harmonic distortion mitigation system. Construction phase. Under budget.* Grouped with nine other facilities.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors