• Connect downspouts to storm sewer system
• Improve storm/site drainage in selected areas
• Construct concrete curb ramps to access playslab area
• Repair/replace approximately 30,000 square feet of built-up roofing
• Repair/replace deteriorated exterior windows
• Install sinks in art room
• Replace selected library casework, furniture and equipment
• Install storage shelving and cabinets in selected classrooms
• Replace damaged ceiling tile in main corridors
• Renovate/refurbish student and faculty restrooms
• Replace exhaust fans in student and faculty restrooms
• Install new ventilation equipment to serve cafeteria and gym
• Replace deteriorated domestic water and sanitary sewer lines
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Repair/replace roofing in 100- and 300-classroom wings, main corridor and administration area, kitchen, loading dock and mechanical room
• Replace windows in administration area
• Install security fencing between building wings
• Cafeteria and kitchen improvements

Phases

Current Schedule Budget General Environmental
Improve storm/site drainage in selected areas. Complete. Within budget used 2002 bond funds.* Focus of work to eliminate water intrusion into crawlspaces, provide ventilation of crawlspaces.
Renovate/refurbish student and faculty restrooms. Complete. Under budget.*
Replace/insulate deteriorated domestic sewer water and sanitary sewer piping. Complete. Under budget.*
Install additional security lighting, improve storm drainage systems, replace 30,000 feet of built-up roofing, repair and replace exterior windows, renovate restrooms, replace sewer piping, construct accessibility ramps, install playscape cover, install sinks in art room, replace furniture and equipment in library, install storage shelves and cabinets in some classrooms, replace damaged ceiling tiles, cover exposed conduit and wiring, install exhaust fans in restrooms, install new air conditioning and heating units in cafeteria and gym, safety and security upgrades. Complete. Over budget. Re-roofing of gymnasium funded from maintenance and operations budget.* Additional work was added to the original project including unclogging a sewer line and adding fans to student restrooms in classrooms. Project will use green building strategies.
Site and utility renovations. Complete. Grouped with work at Barton Hills Elementary School.
Renovations to doors and windows. Complete. Within budget.* Grouped with a project at Barton Hills Elementary School.
Roof repair and replacement at the 100- and 300-classroom wings, main corridor, administration area, kitchen, loading dock and mechanical room. Complete. Over budget.* Where applicable, roof insulation will be upgraded and a solar reflective roof membrane will be installed.
Cafeteria/kitchen renovations: replace mop sink, install handwash sink, enclose ductwork, repair hook at dishwashers, replace piping below kitchen and install new dumpster pad. Complete. Over budget due to anticipated additional work related to piping replacement.* Grouped with projects at four other schools.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors