Projects for Graham

2004 Bond Program Scope of Work

• Construct eight-classroom addition
• Construct gym, cafeteria, and administration expansions
• Sealcoat and restripe south parking lot
• Construct concrete dumpster pad
• Install additional exterior security lighting
• Improve storm/site drainage at building perimeter
• Repair/replace deteriorated exterior doors, frames, and hardware
• Replace/reseal expansion joints in exterior masonry walls
• Replace approximately 43,000 square feet of built-up roofing and metal canopy
• Repair/replace damaged corridor walls in 100- and 200-wings
• Replace folding partitions between selected classrooms
• Refurbish/replace casework in library
• Replace clock system
• Refurbish/replace interior doors and hardware
• Replace floor covering in music room and administration area
• Renovate/refurbish student and faculty restrooms
• Replace deteriorated ventilation system controls and equipment
• Replace deteriorated exhaust fans in restrooms
• Replace ventilation system equipment in selected locations
• Connect 300/400- classroom wing to main domestic water line and to sanitary sewer main
• Replace sanitary sewer line serving kitchen
• Construct story-telling structre in library
• Install playslab cover
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades

Phases

Current Schedule Budget General Environmental
Install supplemental fresh outside air system for classrooms and cafeteria heating, ventilation and air conditioning system units. Complete. Within budget. Funded with 2002 bond funds.* Grouped with one other school.
New eight-classroom addition, commons, gym, cafeteria and administration offices, new playslab cover, parking spaces, roofing work, heating, ventilation and air conditioning system renovation work, repair and renovation to existing building, safety and security enhancements. Complete. Over budget.* Asbestos abatement was needed which initially delayed the project. A new retention/detention pond may be required for this project; the District’s sustainability and commissioning consultants will be involved in the project.
Replace fire alarm system. Complete. Within budget. Funded with 2002 bond funds.* Grouped with two other schools.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Upcoming Events
There are no events scheduled. Other Events
  For Contractors