2004 Bond Program Scope of Work
Construct additional parking spaces in selected areas and reseal/restripe existing parking lot
Repave service drive with concrete and construct concrete dumpster pad
Install additional exterior security lighting
Construct drainage improvements around perimeter of building
Repair/replace deteriorated exterior doors, frames and hardware
Repair/replace approximately 35,000 square feet of built-up roofing
Replace window wall system at courtyard
Replace worn folding wall between cafeteria and gym
Replace folding walls between classrooms and replace damaged paneling
Repair/replace deteriorated cabinets and sinks in selected classrooms
Replace deteriorated floor tile in corridor at stage
Renovate/refurbish student and faculty restrooms
Replace deteriorated exhaust fans in student restrooms
Repair/replace ventilation system heating boiler, pumps, piping and selected equipment
Install emergency egress lighting
Repair/replace deteriorated switchgear, motor controls and transformers
Expand cafeteria and kitchen
Add new PE teachers office, including restroom, shower and storage space
Install playslab cover
Install safety and security enhancements
2008 Bond Program Scope of Work
Technology upgrades
Replace electric drinking fountains
Replace heating, ventilation and air conditioning system equipment in 300-classroom wing
Install locking system for doors to classroom areas
Install automatic power factor correction and harmonic distortion mitigation system
Projects Funded Through Contingency Funds Critical Renovations:
Repair/replace heating, ventilation and air conditioning equipment
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Install additional security lighting, construct drainage improvements, repair exterior doors, replace 35,000 square feet of built-up roofing, replace window wall; renovate restrooms, construct on-site parking and reseal existing parking lot, repave service drive, install playslab cover, replace folding wall between cafeteria and gym, construct permanent walls between classrooms, repair and replace cabinets and sinks in classrooms, replace floor tile, replace exhaust fans, repair heating and air conditioning system and make upgrades, install emergency egress lighting, replace electrical equipment, expand cafeteria and kitchen, add new PE teachers office, install safety and security enhancements. |
Complete.
|
Within budget.* |
|
All designs will meet the Austin Energy standards. |
| Renovate/refurbish student and faculty restrooms; replace worn folding wall between cafeteria and gym; replace three heating, ventilation and air conditioning system air handling units and install new units to serve the library; repair/replace deteriorated switchgear, motor controls and transformers; expand cafeteria and kitchen. |
Complete. |
Within budget.* |
Free standing gym built instead of expanding the cafeteria and kitchen. |
All designs will meet the Austin Energy standards. |
| Construct drainage improvements around perimeter of building to divert storm water away from building; construct additional on-site parking and re-seal/re-stripe existing parking lot; re-pave service drive with concrete dumpster pad; install playslab cover; replace various heating, ventilation and air conditioning units; add new PE teachers office including restroom, shower and storage space; construct new PE building. |
Complete. |
Over budget.* |
Gym construction, associated sitework and all other work complete. |
|
| Safety and security: closed circuit TV. |
Complete. |
Within budget.* |
Grouped with three other schools. |
|
| Safety and security: card reader door access and door repair. |
Complete. |
Within budget.* |
|
Grouped with one other school. |
| Replace heating, ventilation and air conditioning equipment at two art rooms, music room and MDF room. |
Complete. |
Under budget.* |
|
Energy efficient heating, ventilation and air conditioning equipment installed. |
| Replace interior hardware at classroom vestibules. |
Complete. |
Under budget.* |
Grouped with projects at two other schools. |
|
| Repair/replace heating, ventilation and air conditioning equipment. |
Substantially complete. |
|
Grouped with projects at Oak Hill Elementary School and Covington Middle School. |
|
| Install automatic power factor correction and harmonic distortion mitigation system. |
Construction phase.
|
Under budget.*
|
Grouped with nine other facilities. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|
Find Out What's Happening at your School
Upcoming Events
There are no events scheduled.
Other Events
|