2004 Bond Program Scope of Work
• Construct additional parking spaces in selected locations
• Install additional exterior security lighting
• Install concrete dumpster pad with screen wall
• Install student drop-off sidewalk along Vargas Road and Ponce Street
• Replace deteriorated exterior doors, frames and hardware
• Repair/replace approximately 20,000 square feet of built-up roofing
• Replace window wall system at gym
• Repair/replace paneling in selected classrooms
• Repair/refurbish student classroom and group restrooms
• Replace selected deteriorated ventilation equipment
• Replace sanitary sewer line from courtyard to street
• Replace selected library casework/cabinetry/furnishings
• Renovate/remodel selected areas in library
• Install playslab cover
• Install safety and security enhancements
2008 Bond Program Scope of Work
• Technology upgrades
• Cafeteria and kitchen improvements
Projects Funded Through Contingency Funds Critical Renovations:
• Repair/replace sanitary sewer line
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Cafeteria renovations: modify/add hand wash sink(s), install backflow preventers, install forced air ventilation in restroom, replace ceiling, enclose exposed ductwork and electrical conduit, install splashguards. |
Complete. |
Over budget due to unanticipated additional work required by Health Department and Industrial Waste Department. |
Grouped with two other schools. Project delayed due to City of Austin inspections. Additional scope required included grease traps, view ports and revised kitchen layouts. |
|
| Replace window wall system at gym; repair/refurbish student classroom and group restrooms; construct additional parking spaces at faculty parking lot; install concrete dumpster pad with screen wall; install student drop-off sidewalk along Vargas; replace deteriorated exterior doors, frames, hardware and side lights; replace sanitary sewer line from courtyard to street. |
Complete. |
Within budget.* |
Initial bids were too high and project had to be re-bid. Project paired with work at Brook Elementary School. |
All new mechanical systems will meet and exceed the latest energy standards. Consultant will commission the project to ensure that all systems operate at peak efficiency. |
| Install additional exterior security lighting. |
Complete. |
Within budget.* |
|
|
| Repair/replace approximately 20,000 square feet of built-up roofing. |
Complete. |
Under budget. Added some additional work.* |
|
New replacement roof system will provide increased thermal efficiency and solar reflectivity. |
| Safety and security enhancements: card reader door access. |
Complete. |
Within budget.* |
|
|
| Heating and air conditioning improvements. |
Complete. |
Within budget.* |
Additional heating, ventilation and air conditioning work included from 2008 Bond Program. Grouped with Brooke Elementary School. |
All new mechanical systems will meet and exceed the latest energy standards. |
| Install playslab cover. |
Complete. |
Over budget.* |
|
|
| Repair/replace classroom paneling. |
Complete. |
Within budget.* |
|
|
| Repair/replace sanitary sewer line. |
Complete. |
|
Grouped with four other schools. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|
Find Out What's Happening at your School
Upcoming Events
There are no events scheduled.
Other Events
|
For Contractors |
|
|