2004 Bond Program Scope of Work

• Replace deteriorated exterior doors, frames and hardware
• Repair/replace approximately 60,000 square feet of built-up roofing
• Replace inoperable windows in the 200, 300, and 400-classroom wings
• Install elevator in 600-wing
• Construct two-classroom science addition and renovate selected science classrooms
• Refurbish damaged/deteriorated classroom cabinets and casework
• Modify/repair corridor ceilings in selected areas
• Renovate/refurbish student toilets
• Replace deteriorated ventilation system controls and equipment
• Replace two ventilation system chillers
• Replace deteriorated restroom and dressing room exhaust fans
• Repair/replace mechanical room roof drain and cooling tower drain line
• Repair/replace/modify ventilation system equipment in selected locations
• Replace aging electrical switchgear
• Replace domestic water piping in boiler room
• Expand theater to 490-seat capacity
• Install safety and security enhancements

2008 Bond Program Scope of Work

• Technology upgrades
• Replace windows at 100- and 200-classroom wings and reglaze windows in two-story 600-classroom wing
• Replace bleachers
• Renovate four-science classrooms
• Cafeteria and kitchen improvements
• Install automatic power factor correction and harmonic distortion mitigation system

Projects Funded Through Contingency Funds

Critical Renovations:
• Replace electrical equipment
• Repair/replace waste lines and grease trap
• Replace built-up roofing
AAFR Projects:
• Graduation Pathways Program
• South alternative education learning support centers

Phases

Current Schedule Budget General Environmental
Bid as single project September 2005. Science classrooms, fine arts addition including enlarging existing auditorium to seat 470 persons and providing stage and proscenium area, ventilation replacement and repair, reroofing 200-, 300- and 400-wings and miscellaneous areas, safety and security improvements, restroom improvements, accessibility improvements and ceilings. Complete. Over budget using program contingency funds.* Project will contain all applicable Green Building components, science addition goal to reach Austin Energy two-star Green Building rating for project components. City of Austin rebates will apply for project chillers.
Refurbish/replace ventilation system cooling tower, boilers and selected equipment. Complete. Over budget using program contingency funds.* Project designed with sustainability and environmental impact in mind. After completion, ensure all newly installed mechanical systems operate at peak efficiency.
Repair/reseal paving at student parking lot. Complete. Under budget.*
Exterior door replacement. Complete. Within budget.*
Safety and security: closed circuit TV. Complete. Within budget.*
Renovate four science classrooms; improve cafeteria/kitchen; replace windows in designated classroom wings. Complete. Over budget. Awarded with use of program contingency funds.* Renovation will began January 2010 with remaining science classroom and all window work taking place during summer 2010. Replacement of additional windows increased original project scope. Building systems designed to meet Green Building principles.
South alternative education learning support centers. Complete. Grouped with 15 other schools.
Replace electrical equipment. Complete. Grouped with Lanier High School.
Replace built-up roofing. Complete. Over budget.*
Repair/replace waste lines and grease trap. Substantially complete. Under budget.* Grouped with Martin Middle School and Reagan High School.
Graduation Pathways Program Substantially complete. Under budget.* Grouped with Lanier High School.
Install automatic power factor correction and harmonic distortion mitigation system. Construction phase. Under budget.* Grouped with nine other facilities.

*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well within the total program budget.

Photos

Click on photo for larger version.

There are no images for this project.
Find Out What's Happening at your School
SMTW TFS
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30
Upcoming Events
There are no events scheduled. Other Events
  For Contractors