2004 Bond Program Scope of Work
• Improve storm/site drainage in selected areas
• Excavate and re-establish storm water detention/filtration pond
• Replace deteriorated exterior doors, frames and hardware
• Reseal masonry control/expansion joints
• Repair/replace approximately 70,000 square feet of roofing
• Enlarge and renovate selected science classrooms
• Replace selected library casework/cabinetry/furnishings
• Replace clock system
• Renovate selected student and public restrooms
• Replace deteriorated ventilation system controls and equipment
• Refurbish/replace ventilation system cooling tower, four chillers, boilers, pumps and selected equipment
• Replace deteriorated exhaust fans
• Install emergency egress and exit lights
• Install additional lighting in hallways of 170- and 270-classroom wings and open courtyards
• Install eyewash sinks in science labs
• Add elevator at west courtyard
• Renovate boys’ athletic locker room
• Install safety and security enhancements
2008 Bond Program Scope of Work
• Technology upgrades
• Purchase automotive/collision equipment for Automotive Career Center
• Construct two-science classroom addition
• Install science safety equipment
• Cafeteria and kitchen improvements
• Replace dishwasher
• Install automatic power factor correction and harmonic distortion mitigation system
Projects Funded Through Contingency Funds Critical Renovations:
• Repair/replace main frame distribution heating, ventilation and air conditioning equipment
• Add emergency generator and auto transfer switch in main distribution frame
AAFR Projects:
• South alternative education learning support centers
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Removal of existing drywall partition and installation of additional electronic components in the main distribution frame technology control room. |
Complete. |
Under budget.* |
Modification will expand Greater Austin Area Telecommunications Network (GAATN) system to accommodate new schools. |
Asbestos abatement was performed on a drywall partition and limited amount of floor tile. The work has been completed. |
| Install traffic gates. |
Complete. |
Within budget.* |
|
|
| Repair/replace approximately 70,000 square feet of roofing. Includes roof replacement and metal deck remediation work above performing arts center, band hall, weight room and gymnastics room. |
Complete. |
Under budget.* |
|
Replacement roof system will have increased thermal efficiency and solar reflectivity. |
| Safety and security: card reader door access. |
Complete. |
Within budget.* |
|
|
| Site drainage improvements, science classrooms renovations, plumbing upgrades, heating, ventilation and air conditioning system modifications, elevator installation, door hardware modifications, re-seal exterior masonry, and safety and security enhancements. |
Complete. |
Over budget.* |
Delay due to asbestos on plumbing. |
An energy consultant was retained for this work. Implementation included high efficiency ventilation, water quality and water savings measures. |
| Replace 42,000 square feet of built-up roofing and insulation. |
Complete. |
Under budget.* |
|
New roof will provide increased thermal efficiency and solar reflectivity. |
| Construct two-science classroom addition and acquire science safety equipment; construct kitchen improvements; replace dishwasher. |
Complete. |
Under budget.* |
The school-approved design solution was to remodel the existing Theater Arts classroom space into two science classrooms and construct a new Theater Arts classroom/Black Box addition to the Theater/Auditorium building. Change order work largely associated with placement of two heating, ventilation and air conditioning units in the gym was funded through the Maintenance and Operations (M&O) budget. |
New construction will meet Austin Energy Green Building two-star rating. |
| South alternative education learning support centers. |
Complete. |
|
Grouped with 15 other schools. |
|
| Add emergency generator and auto transfer switch in main distribution frame. |
Complete. |
Under budget.* |
|
|
| Repair/replace main frame distribution heating, ventilation and air conditioning equipment. |
Construction phase. |
Over budget.* |
Grouped with three other schools. |
|
| Install automatic power factor correction and harmonic distortion mitigation system. |
Construction phase.
|
Under budget.* |
Grouped with 10 other facilities. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.