2004 Bond Program Scope of Work
• Improve storm/site drainage at selected building entrance ways
• Repair/replace approximately 60,000 square feet of built-up roofing
• Apply slip-resistant surfacing on stair treads and landings
• Repair exterior canopy soffits and replace light fixtures
• Refurbish ceramic floor tile in all restrooms
• Renovate/refurbish student restrooms
• Refurbish/replace tile flooring and lighting in girls' and boys' PE locker/shower rooms
• Install additional lighting in theater for classroom use
• Replace deteriorated ceiling tile and grid in selected corridors
• Install additional instrument and equipment storage in fine arts area
• Refurbish/replace shelving and counters in photojournalism room
• Provide acoustical separation between classrooms 246-248
• Refurbish four interior stairways
• Repair/replace bleachers at gym
• Refurbish/replace interior doors, frames and hardware
• Replace lighting in counselors' area
• Repair/replace deteriorated student lockers
• Replace one ventilation system chiller and two boilers
• Replace deteriorated ventilation system controls and equipment
• Replace deteriorated restroom exhaust fans
• Refurbish/replace selected ventilation equipment
• Replace electrical switchgear, motor controls and transformer
• Install additional exterior security lighting
• Install additional electrical circuits for new computer labs
• Repair/replace mechanical room roof drain and cooling tower drain line
• Replace hot water recirculation pumps
• Install sink in counselors' area
• Install safety and security enhancements
2008 Bond Program Scope of Work
• Technology upgrades
• Construct four-science classroom addition
• Install science safety equipment
• Construct 12-classroom addition
• Improvements to fine arts area
• Replace selected heating, ventilation and air conditioning system equipment
• Construct four additional tennis courts
• Install automatic power factor correction and harmonic distortion mitigation system
Projects Funded Through Contingency Funds Critical Renovations:
• Replace elevator
AAFR Projects:
• North alternative education learning support centers
Phases
| Current |
Schedule |
Budget |
General |
Environmental |
| Phase I: Replace approximately 30,000 square feet of built-up roofing. |
Complete. |
Within budget.* |
|
|
| Phase II: Safety and security: card reader door access and closed circuit TV. |
Complete. |
Within budget.* |
|
|
| Separate Project: Bleacher replacement. |
Complete. |
Within budget.* |
|
|
| Drainage, ventilation and accessibility improvements. |
Included in Phase III. |
Included in Phase III.* |
After field investigations, it was determined that proper drainage improvements should offset any ventilation requirements to control moisture in crawlspaces. |
Environmental considerations are limited to on-site drainage projects. Care will be taken to avoid excess soil erosion during construction. |
| Phase III: Create accessibility compliant walkways, improve drainage, install piping, replace additional 30,000 square feet of built-up roofing, refurbish floor tile, renovate student restrooms, upgrade PE locker rooms, install additional lighting in theater, replace heating air conditioning chiller, replace boilers, replace control system, replace exhaust fans, replace electrical gears and transformer, install exterior security lighting, repair roof drains, replace cooling tower drain line, replace hot water pumps, repair exterior canopy, replace light fixtures, replace ceiling tiles, install instrument and equipment storage in fine arts area, replace shelving and counters in photo journalism room, provide acoustical separation of classrooms, refurbish stairs, refurbish interior doors, replace lighting, repair heating and air conditioning units, install sinks, install safety and security enhancements. |
Phases I, II and III are complete. |
Within budget.* |
The overall project was divided into three phases. Phase I is 30,000 square feet of roofing. Phase II is interior work including safety and security work. Phase III is additional roofing and remaining interior and exterior work. |
All designs will meet the Austin Energy standards. |
| Construct 12-classroom addition and fine arts improvements; construct four-science classroom addition and acquire science safety equipment; repair/renovate selected heating, ventilation and air conditioning equipment; construct four additional tennis courts. |
Phase I: Complete. Phase II: Complete. Phase III: Complete. Phase IV: Complete. |
Within budget.* |
Numerous meetings and discussions with principal, staff, Campus Task Force and team have occurred. Phase I work, which includes conversion of a portion of the boy’s PE locker room into an additional athletic locker room an demolition in areas to be converted to classrooms is complete. Phase II of this project, which includes the new science classroom addition, band hall addition and 12 new classrooms and interior renovations, is complete. Phase III work, which includes fine arts renovations was completed in January 2011. Phase IV, the construction of a dance facility (auxiliary gym) was approved by the Board in January 2011. |
Awarded Austin Energy Green Building two-star rating. |
| North alternative education learning support centers. |
Complete. |
|
Grouped with 14 other schools. |
|
| Replace elevator. |
Construction phase. |
|
|
|
| Install automatic power factor correction and harmonic distortion mitigation system. |
Construction phase. |
Under budget.* |
Grouped with nine other facilities. |
|
|
*Budget for the 2004 and 2008 Bond Programs are reported as both individual project budgets and overall
program budget. While specific projects may be over or under budget, the 2004 and 2008 Bond Programs remain well
within the total program budget.
Photos
Click on photo for larger version.
| There are no images for this project. |
|
|